Not many years ago, river linking was a concept but it is becoming a reality in the country. Discuss the advantages of river linking and its possible impact on the environment.

UPSC Mains 2017, GS Paper 3, Question 8. What the question asks, how to plan 150 words, and an outline of a model answer.

GS3 · 201710 marks150 words8 minutesEnvironment

Source: UPSC Civil Services (Main) 2017, General Studies Paper III, page 3 (official UPSC paper, PDF)

What it’s asking

  1. Advantages of river linking. Discuss the economic and social gains of transferring water from surplus to deficit basins.

  2. Environmental impact. Discuss the likely ecological costs of large inter-basin transfers, with an Indian example.

  3. Balanced way forward. Suggest how benefits can be secured while limiting environmental harm.

Approach

A 150-word plan you can hold in your head in the exam hall.

  1. Intro~26 words

    Uneven water distribution; NPP 1980 and NWDA; Ken-Betwa as first link under way.

  2. Body~98 words

    Advantages: irrigation, drought and flood relief, drinking water, power, navigation; then environmental impacts.

  3. Conclusion~26 words

    Link-by-link appraisal, cumulative impact studies and local alternatives.

AI-drafted model answer

Drafted by AI and not yet checked by a person. One way to answer it, not the only one.

Intro
Uneven water spread; NPP 1980 plan now real with Ken-Betwa link.
Body
  • Irrigation and drought relief in deficit basins; groundwater recharge.
  • Flood moderation in surplus basins; drinking water for drought regions.
  • Hydropower and inland navigation as co-benefits.
  • Forest and wildlife submergence, e.g. Panna Tiger Reserve.
  • Lower flows harm deltas, mangroves and fisheries; sediment trapped.
  • Waterlogging, salinity, mixing of aquatic species, displacement.
Conclusion
Appraise each link with cumulative impact studies, e-flows and local water alternatives.

Sources: Ministry of Water Resources, National Perspective Plan for Water Resources Development, 1980 · National Water Development Agency (est. 1982) · Ken-Betwa Link Project, approved by Union Cabinet in 2021

Related questions

From the same paper, GS Paper 3, 2017

Write this and get it evaluated

3 free evaluations a month. Write on paper, upload a photo, and see a marks range, notes on your sheet and what to fix.

Loading sign-in options

No card. Model answers stay free.