India has achieved remarkable successes in unmanned space missions including the Chandrayaan and Mars Orbitter Mission, but has not ventured into manned space missions. What are the main obstacles to launching a manned space mission, both in terms of technology and logistics? Examine critically.

UPSC Mains 2017, GS Paper 3, Question 7. What the question asks, how to plan 150 words, and an outline of a model answer.

GS3 · 201710 marks150 words8 minutesScience and technology

Source: UPSC Civil Services (Main) 2017, General Studies Paper III, page 3 (official UPSC paper, PDF)

What it’s asking

  1. Technological obstacles. Identify the engineering hurdles that separate human spaceflight from unmanned missions.

  2. Logistical obstacles. Explain the crew, recovery, infrastructure and funding challenges of a crewed mission.

  3. Critical examination. Judge how serious these obstacles are and how far India has overcome them through Gaganyaan.

Approach

A 150-word plan you can hold in your head in the exam hall.

  1. Intro~26 words

    Contrast robotic successes with the far higher safety bar of human spaceflight.

  2. Body~98 words

    Technology hurdles, then logistics, then a critical note on progress made.

  3. Conclusion~26 words

    Obstacles are surmountable with testing and partnerships; human spaceflight builds future capability.

AI-drafted model answer

Drafted by AI and not yet checked by a person. One way to answer it, not the only one.

Intro
Robotic missions tolerate failure; crewed flight demands near-zero risk to life.
Body
  • Human-rated launcher with redundancy and lower stress margins.
  • Crew escape system, life support, re-entry heat shield and parachutes.
  • Astronaut selection, training, space medicine and sea recovery.
  • Tracking network, test facilities, high cost and long timelines.
  • Critical view: TV-D1, Axiom-4 and indigenous ECLSS show steady progress.
Conclusion
Obstacles are surmountable; Gaganyaan paves the way to Bharatiya Antariksh Station.

Sources: Union Cabinet approval of Gaganyaan programme, December 2018 · ISRO, Gaganyaan Test Vehicle TV-D1 mission, October 2023

Related questions

From the same paper, GS Paper 3, 2017

Write this and get it evaluated

3 free evaluations a month. Write on paper, upload a photo, and see a marks range, notes on your sheet and what to fix.

Loading sign-in options

No card. Model answers stay free.